Monday, August 11, 2014

painting and wallpapering the basement den

We closed the door off to the bathroom since it has an entry from the other side, and wallpapered that wall. Then I did some painting on the fireplace and elsewhere!



more and more tile!

We tiled the new room! This room is huge and tiling was not difficult, just time consuming.









Monday, May 19, 2014

Starting floor tiles.

We purchased 2000sf ceramic floor tile in a neutral color to use in all the places that have no flooring and are in areas with concrete under (and some areas that may get wet). Since we had so much unfloored area to cover, price was a big issue. We do plan on using lots of area rugs for color and warmth. We have installed about 100 tiles so far and have not yet made cuts. It's not too difficult but it is time consuming. This area took about 4 hours and 100 lbs of dry thin set mortar. This room is about 20% tiled now.


Sunday, May 4, 2014

black ceiling, crown moulding, nearing completion on kitchen and dining room!

We probably should have painted the ceiling black before hanging the edison lights, 
but this story sometimes writes itself.






Sunday, March 23, 2014

Finally back to work! Mirror backsplash and red barn light

We finally got to work again after I had been traveling for 10 days. It's difficult to get time anyway between trying to keep the house we live in ready for selling, working at our jobs, and making time for family. But alas, this weekend was productive! We have been working on finishing the kitchen. It's about 90% there. We began installing the recycled 3x3" mirror tile on the backsplash area. We used a sort of double stick tape type product I found at Home Depot, which works great! We are not grouting the tile so they have sort of a disco ball effect. I ran out of the mirror tile so had to order more from Amazon. Since it is recycled glass, it is imperfect, which I always love.

Also, we installed an old red barn light I picked up thrifting for $15.